Assembly set for the construction of a 90° bend in a screed-flush duct.
Continously hot galvanized (Sendzimir process) (DIN EN 10346)
weight | |||
---|---|---|---|
UEBSMB 20S | 0,34 kg | ||
UEBSMB 30S | 0,45 kg | ||
UEBSMB 40S | 0,56 kg | ||
UEBSMB 50S | 0,73 kg |
Assembly set for the construction of a 90° bend in a screed-flush duct.
weight | |||
---|---|---|---|
UEBSMB 20S | 0,34 kg | ||
UEBSMB 30S | 0,45 kg | ||
UEBSMB 40S | 0,56 kg | ||
UEBSMB 50S | 0,73 kg |